1.The water heater should install in the non-visor's place, and main body exposed to the sun  (due south or 10 degrees about in the west), and fixed reliable in order to avoid the bad gale weather blowing down the water heater;
2.Water heater’s main body assembly order: Assembles the carriage first, latter installs the heat preservation water tank, then installs the vacuum collection heat pipe, finally installs the diffuse reflection board (counter-diffraction grating); 3. When installing the vacuum collection heat pipe, firstly holds the tail the card to enter the tail carrier, then spreads some liquid detergent and so on lubricant in the vacuum collection heat pipe ring-like mouth outer wall, puts on the dust ring then the vacuum tube spool thread and the water tank vacuum cable channel axis alignment, slowly in the precession water tank, then carefully turns on lathe pulling back on the tailstock. Pay attention to installing firstly two vacuum collection heat pipe of the heat preservation bucket most flank, adjust the vacuum tube and the water tank hole all around gap causes it to be even, then install other vacuum tubes;
4. After the water heater main body assembly completes, then carries on the pipelining. The heat preservation water tank both sides cover have five holes, may install the way according to the actual need nimble choice, but regardless of which kind installs the way, must install the air vent properly, on ventilates, to get down the overflow, in order to avoid because of ventilates impeded, but the bulge bad or pulls out the shrivelled water tank;
5. Refuses the vacuum collection heat pipe exposes to the sun after the water sky to pour into cold water suddenly, enters cold water by against vacuum collection heat pipe under the high temperature to rupture suddenly. If carries on the installment under the hot sun, available obstructs the masculinity to provide shade or overbrims the vacuum collection heat pipe the water, installed after completely finishes, sailed upstream immediately. Suggested the sailing upstream time is not too high when at night or the morning temperature;
6. In order to guarantee that can also use normally in the cold winter, suggested on launches the pipeline to use the heat preservation or the evacuation measure, cracks as a result of freezing by against pipeline freeze affects the use;
7. Arranges when the pipeline should not destroy building's contour to be artistic, on the sewer must with the building fixed reliable.